Sign In  |  Register  |  About San Rafael  |  Contact Us

San Rafael, CA
September 01, 2020 1:37pm
7-Day Forecast | Traffic
  • Search Hotels in San Rafael

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

AECOM selected as Lead Designer for Portage Bay Bridge replacement in Seattle, Washington

AECOM (NYSE:ACM), the world’s trusted infrastructure consulting firm, today announced it will serve as Lead Designer for the Washington State Department of Transportation’s (WSDOT) SR 520 Portage Bay Bridge and Roanoke Lid Project, as part of a design-build team led by Skanska. The project calls for replacing the existing Portage Bay Bridge and creating a landscaped lidded segment in Seattle’s North Capitol Hill neighborhood. Once complete, commuters across Lake Washington and through the SR 520 corridor will have access to new ramps, seismically resilient structures and improved connections to transit, local streets, and local and regional shared-use trails.

“We are excited to continue building on our decades-long relationship with the WSDOT, supporting the critical infrastructure needs of one of the Puget Sound region's busiest highway corridors,” said Matt Crane, chief executive of AECOM’s U.S. West region. “Our industry-leading experience spans every type of highway and bridge project, including several of the world’s largest design-build projects. AECOM is committed to support the program’s goal of creating safer travel and improving mobility, aligning with our core mission of delivering a better world.”

In this role, AECOM will oversee the technical design of two new parallel bridges – one for eastbound traffic and the other for westbound – that replace the 1960s-era Portage Bay Bridge with a seismically stronger structure. The project also will build a landscaped lid over SR 520 between 10th Avenue East and Delmar Drive East and improve regional mobility by completing the SR 520 Program’s transit & HOV enhancements between Redmond and Seattle.

“This vital project will not only improve mobility along one of Washington State’s most congested routes but support new, vibrant public spaces thanks to its innovative lid design,” said Mark Southwell, chief executive of AECOM’s global Transportation business. “Our team will leverage their integrated expertise across the built environment to meet the project’s holistic objectives, supporting both improved mobility and a connected, livable local community.”

The eastbound bridge will extend the regional bicycle and pedestrian SR 520 Trail across Portage Bay, connecting to the city of Seattle’s non-motorized trail network. Construction of the landscaped lid over the highway will create nearly three-acres of recreational open space and reconnect communities that were severed by the original construction of SR 520.

About AECOM

AECOM (NYSE: ACM) is the world’s trusted infrastructure consulting firm, delivering professional services throughout the project lifecycle – from advisory, planning, design and engineering to program and construction management. On projects spanning transportation, buildings, water, new energy, and the environment, our public- and private-sector clients trust us to solve their most complex challenges. Our teams are driven by a common purpose to deliver a better world through our unrivaled technical and digital expertise, a culture of equity, diversity and inclusion, and a commitment to environmental, social and governance priorities. AECOM is a Fortune 500 firm and its Professional Services business had revenue of $14.4 billion in fiscal year 2023. See how we are delivering sustainable legacies for generations to come at aecom.com and @AECOM.

Forward-Looking Statements

All statements in this communication other than statements of historical fact are “forward-looking statements” for purposes of federal and state securities laws, including any statements of the plans, strategies and objectives for future operations, profitability, strategic value creation, risk profile and investment strategies, and any statements regarding future economic conditions or performance, and the expected financial and operational results of AECOM. Although we believe that the expectations reflected in our forward-looking statements are reasonable, actual results could differ materially from those projected or assumed in any of our forward-looking statements. Important factors that could cause our actual results, performance and achievements, or industry results to differ materially from estimates or projections contained in our forward-looking statements include, but are not limited to, the following: our business is cyclical and vulnerable to economic downturns and client spending reductions; potential government shutdowns or other funding circumstances that may cause governmental agencies to modify, curtail or terminate our contracts; losses under fixed-price contracts; limited control over operations that run through our joint venture entities; liability for misconduct by our employees or consultants; failure to comply with laws or regulations applicable to our business; maintaining adequate surety and financial capacity; potential high leverage and inability to service our debt and guarantees; ability to continue payment of dividends; exposure to political and economic risks in different countries, including tariffs, geopolitical events, and conflicts; currency exchange rate and interest fluctuations; retaining and recruiting key technical and management personnel; legal claims; inadequate insurance coverage; environmental law compliance and adequate nuclear indemnification; unexpected adjustments and cancellations related to our backlog; partners and third parties who may fail to satisfy their legal obligations; managing pension costs; AECOM Capital real estate development projects; cybersecurity issues, IT outages and data privacy; risks associated with the benefits and costs of the sale of our Management Services and self-perform at-risk civil infrastructure, power construction and oil and gas businesses, including the risk that any purchase adjustments from those transactions could be unfavorable and result in any future proceeds owed to us as part of the transactions could be lower than we expect; as well as other additional risks and factors that could cause actual results to differ materially from our forward-looking statements set forth in our reports filed with the Securities and Exchange Commission. Any forward-looking statements are made as of the date hereof. We do not intend, and undertake no obligation, to update any forward-looking statement.

Contacts

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 SanRafael.com & California Media Partners, LLC. All rights reserved.