Sign In  |  Register  |  About San Rafael  |  Contact Us

San Rafael, CA
September 01, 2020 1:37pm
7-Day Forecast | Traffic
  • Search Hotels in San Rafael

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

Tellurian’s Driftwood Natural Gas Transmission Pipeline Project Receives FERC Certificate

Baker Hughes zero-emissions electric-powered compressor technology proposed for cleaner energy delivery

Tellurian Inc. (Tellurian) (NYSE American: TELL) announced that the U.S. Federal Energy Regulatory Commission (FERC) issued the certificate on April 21, 2023 granting authorization for Driftwood Pipeline, LLC’s Line 200 and Line 300, an approximate $1.4 billion natural gas transmission project proposed to be located in Beauregard and Calcasieu Parishes, Louisiana. The pipelines will have the ability to supply up to five and one-half billion cubic feet of natural gas daily with virtually no emissions due to the implementation of electric-powered Integrated Compressor Line (ICL) technology from Baker Hughes.

Tellurian President and CEO Octávio Simões said, “Tellurian thanks the FERC for their thorough and collaborative review of our Driftwood Pipeline Project and we look forward to delivering natural gas in a cleaner and highly reliable way to Southwest Louisiana.”

About Tellurian Inc.

Tellurian intends to create value for shareholders by building a low-cost, global natural gas business, profitably delivering natural gas to customers worldwide. Tellurian is developing a portfolio of natural gas production, LNG marketing and trading, and infrastructure that includes an ~ 27.6 mtpa LNG export facility and an associated pipeline. Tellurian is based in Houston, Texas, and its common stock is listed on the NYSE American under the symbol “TELL”.

For more information, please visit www.tellurianinc.com. Follow us on Twitter at twitter.com/TellurianLNG

CAUTIONARY INFORMATION ABOUT FORWARD-LOOKING STATEMENTS

This press release contains forward-looking statements within the meaning of U.S. federal securities laws. The words “anticipate,” “assume,” “believe,” “budget,” “estimate,” “expect,” “forecast,” “initial,” “intend,” “may,” “plan,” “potential,” “project,” “proposed,” “should,” “will,” “would,” and similar expressions are intended to identify forward- looking statements. Forward-looking statements herein relate to, among other things, the capacity, cost, emissions and other aspects of the transmission project. These statements involve a number of known and unknown risks, which may cause actual results to differ materially from expectations expressed or implied in the forward-looking statements. These risks include the matters discussed in Item 1A of Part I of the Annual Report on Form 10-K of Tellurian for the fiscal year ended December 31, 2022, filed by Tellurian with the Securities and Exchange Commission (the SEC) on February 22, 2023, and other Tellurian filings with the SEC, all of which are incorporated by reference herein. The forward-looking statements in this press release speak as of the date of this release. Although Tellurian may from time to time voluntarily update its prior forward-looking statements, it disclaims any commitment to do so except as required by securities laws.

Contacts

Stock Quote API & Stock News API supplied by www.cloudquote.io
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 SanRafael.com & California Media Partners, LLC. All rights reserved.