Sign In  |  Register  |  About San Rafael  |  Contact Us

San Rafael, CA
September 01, 2020 1:37pm
7-Day Forecast | Traffic
  • Search Hotels in San Rafael

  • CHECK-IN:
  • CHECK-OUT:
  • ROOMS:

Gold Resource Corporation Reports Q2 2021 Production

DENVER, CO / ACCESSWIRE / July 14, 2021 / Gold Resource Corporation (NYSE American:GORO) (the "Company") today announced preliminary second quarter 2021 production results.

Second Quarter 2021 Production Highlights

  • 9,685 gold equivalent ounces ("Au eq oz") sold, inclusive of 5,697 gold ounces ("Au oz") and 270,321 silver ounces ("Ag oz"),
  • 365 tonnes of payable copper,
  • 1,214 tonnes of payable lead, and
  • 3,193 tonnes of payable zinc.

Allen Palmiere, President and CEO, said "Gold production in the second quarter was as expected while silver and base metal production remain modestly behind forecast. We continue to address challenging ground conditions with a change in mine sequencing and the use of paste fill. We remain confident in our annual production guidance for gold equivalent ounces and our Total Cash and All-in Sustaining Costs."

Sales Statistics

 
 For the three months ended June 30,  For the six months ended June 30, 
 
 2021  2020  2021  2020 
Metal sold
 
 
  
 
  
 
  
 
 
Gold (ozs.)
  5,697   2,542   10,716   7,534 
Silver (ozs.)
  270,321   189,866   523,382   545,094 
Copper (tonnes)
  365   215   747   643 
Lead (tonnes)
  1,214   1,014   2,390   2,978 
Zinc (tonnes)
  3,193   2,592   6,327   6,948 
Precious metal gold equivalent ounces sold
                
Gold Ounces
  5,697   2,542   10,716   7,534 
Gold Equivalent Ounces from Silver
  3,988   1,791   7,775   5,409 
Total AuEq oz
  9,685   4,333   18,491   12,943 

Production Statistics


 
 For the three months ended June 30,  For the six months ended June 30, 

 
 2021  2020  2021  2020 
Arista Mine
 
 
  
 
  
 
  
 
 
Milled
 
 
  
 
  
 
  
 
 
Tonnes Milled
  126,363   78,740   253,766   236,776 
Grade
                
Average Gold Grade (g/t)
  1.91   1.73   1.80   1.41 
Average Silver Grade (g/t)
  79   71   78   78 
Average Copper Grade (%)
  0.36   0.39   0.40   0.39 
Average Lead Grade (%)
  1.63   1.92   1.66   1.96 
Average Zinc Grade (%)
  3.64   4.92   3.97   4.75 
Aguila Open Pit Mine
                
Milled
                
Tonnes Milled
  3,227   3,579   14,804   17,827 
Grade
                
Average Gold Grade (g/t)
  2.58   1.46   1.86   1.29 
Average Silver Grade (g/t)
  47   50   33   41 
Mirador Mine
                
Milled
                
Tonnes Milled
  -   5,246   -   7,450 
Grade
                
Average Gold Grade (g/t)
  -   0.79   -   0.91 
Average Silver Grade (g/t)
  -   126   -   130 
Combined
                
Tonnes milled
  129,590   87,565   268,570   262,053 
Tonnes Milled per Day(1)
  1,506   1,943   1,555   1,976 
Metal production (before payable metal deductions)(2)
                
Gold (ozs.)
  6,555   2,441   12,652   8,891 
Silver (ozs.)
  295,979   185,330   603,589   587,872 
Copper (tonnes)
  368   246   809   734 
Lead (tonnes)
  1,654   1,140   3,391   3,654 
Zinc (tonnes)
  3,683   3,004   8,060   8,848 

(1) Based on actual days the mill operated during the period.

(2) The difference between what we report as "Metal Production" and "Metal Sold" is attributable to the difference between the quantities of metals contained in the concentrates we produce versus the portion of those metals actually paid for according to the terms of our sales contracts. Differences can also arise from inventory changes related to shipping schedules, or variances in ore grades and recoveries which impact the amount of metals contained in concentrates produced and sold.

Second Quarter Conference Call Reminder

As a reminder, the Company will issue a news release providing a summary of its financial and operating results for the second quarter ended June 30, 2021 on Tuesday, July 27, 2021 after the market close, file its 10Q with the financial and operating results for the period ended June 30, 2021 with EDGAR and host a conference call on Wednesday, July 28, 2021 at 11:00 a.m. Eastern Time.

The conference call will be recorded and posted to the Company's website later in the day following the conclusion of the call. Following prepared remarks, Allen Palmiere, President and Chief Executive Officer, Kim Perry, Chief Financial Officer and Alberto Reyes, Chief Operating Officer will host a live question and answer (Q&A) session. There are two ways to join the conference call.

To join the conference via webcast, please click on the following link:

https://www.webcaster4.com/Webcast/Page/2361/42039.

To join the call via telephone please use one of the following dial-in details:

Participant Toll Free: 877-545-0320
Participant International: 973-528-0016
Entry Code: 758194

Please connect to the conference call at least 10 minutes prior to the start time using one of the connection options listed above.

About GRC:

Gold Resource Corporation is a gold and silver producer, developer and explorer with operations in Oaxaca, Mexico. Under the direction of a new board and senior leadership, the focus is to unlock the significant upside potential of its existing infrastructure and large land position surrounding the mine. For more information, please visit GRC's website, located at www.goldresourcecorp.com and read the Company's 10-K for an understanding of the risk factors involved.

CONTACT:
Ann Wilkinson
Vice President, Investor Relations and Corporate Affairs
Ann.Wilkinson@GRC-USA.com
www.GoldResourcecorp.com

SOURCE: Gold Resource Corporation



View source version on accesswire.com:
https://www.accesswire.com/655581/Gold-Resource-Corporation-Reports-Q2-2021-Production

Data & News supplied by www.cloudquote.io
Stock quotes supplied by Barchart
Quotes delayed at least 20 minutes.
By accessing this page, you agree to the following
Privacy Policy and Terms and Conditions.
 
 
Copyright © 2010-2020 SanRafael.com & California Media Partners, LLC. All rights reserved.