1934 Act Registration No. 1-14700
SECURITIES AND EXCHANGE COMMISSION
Washington, DC 20549
FORM 6-K
REPORT OF FOREIGN PRIVATE ISSUER
PURSUANT TO RULE 13a-16 OR 15d-16 OF
THE SECURITIES EXCHANGE ACT OF 1934
For the month of July 2010
Taiwan Semiconductor Manufacturing
Company Ltd.
(Translation of Registrants Name Into English)
No. 8, Li-Hsin Rd. 6,
Hsinchu Science Park,
Taiwan
(Address of Principal Executive Offices)
(Indicate by check mark whether the registrant files or will file annual reports under cover
of Form 20-F or Form 40-F.)
Form 20-F þ Form 40-F o
(Indicate by check mark whether the registrant by furnishing the information contained in this
form is also thereby furnishing the information to the Commission pursuant to Rule 12g3-2(b) under
the Securities Exchange Act of 1934.)
Yes o No þ
(If Yes is marked, indicated below the file number assigned to the registrant in connection with
Rule 12g3-2(b): 82: .)
TSMC Begins Construction on GigafabTM In Central Taiwan
Taichung, Taiwan, R.O.C. July 16, 2010 TSMC (TWSE: 2330, NYSE: TSM) today held a
groundbreaking ceremony in Taichungs Central Taiwan Science Park for Fab 15, TSMCs third 12-inch
(300mm) GigafabTM and an important milestone in the companys pledge to expand
investment in Taiwan.
The groundbreaking ceremony was conducted by TSMC Chairman and CEO Dr. Morris Chang. Science
Parks have played a critical role in the development of Taiwans high-tech industry. They have also
provided important support to TSMC as we grew to become a leading global semiconductor company with
its roots in Taiwan, Dr. Chang said. Over the past two decades, TSMC has flourished in the
Hsinchu and Tainan science parks, and our groundbreaking for Fab 15 today sets the foundation for
TSMC to reach new heights.
TSMC has worked unceasingly to improve its technology leadership, manufacturing excellence,
and customer partnership to join together with our fabless and IDM customers to forge a powerful
competitive force in the semiconductor industry. This groundbreaking for Fab 15 in the Central
Taiwan Science Park shows our commitment to providing our customers with advanced technology and
satisfying their capacity needs. And as capacity in Fab 15 grows, it will create 8,000 high-quality
job opportunities, demonstrating TSMCs dedication to corporate social responsibility, Dr. Chang
added.
Fab 15 will be TSMCs third GigafabTM, or fab with capacity of more than 100,000
12-inch wafers per month, and will also be TSMCs second GigafabTM equipped for 28nm
technology. Construction will be divided into four phases, and total investment over the next
several years is expected to exceed NT$300 billion. TSMC is scheduled to begin equipment move-in
for the Phase 1 facility in June 2011, with volume production of 40nm and 28nm technology products
for customers in the first quarter of 2012. More advanced process nodes will be introduced as
TSMCs technology development continues to advance.
In addition, to meet strong customer demand as we build Fab 15, TSMC will continue to expand
capacity at Fab 12 in Hsinchu and Fab 14 in Tainan. Combined capacity of Fab 12 and Fab 14
currently exceeds 200,000 12-inch wafers per month, and is scheduled to exceed 240,000 12-inch
wafers per month by the end of this year, underscoring our commitment to providing steadfast
support to our customers.
Fab 15 will be TSMCs next green fab following Fab 12 and Fab 14, incorporating green
concepts in energy conservation and pollution control in its design, including a process water
conservation rate of 85%, reclamation of rainwater, recirculation and reuse of general exhaust
heat, and development of solar power generation and LED lighting applications. TSMCs goal is to
reach zero emissions of greenhouse gases.